Placentia Regional Wellness Centre

Olympic Construction was the Design-Build Contractor for this new recreation center spanning 1800m². This LEED Silver-certified facility is meticulously designed to seamlessly integrate into the existing PARC Arena, enhancing the overall recreational offerings in the community.

Key Features:

  • Aquatic Centre: Our project includes the construction of a fully-equipped aquatic center, featuring swimming pools, locker rooms, and related amenities to accommodate various aquatic activities and programs.
  • Fitness Studio: We are incorporating a spacious fitness studio equipped with state-of-the-art exercise equipment, providing residents with opportunities for personalized fitness regimes and group workouts.
  • Multi-purpose Room: A versatile multi-purpose room will be included, offering a flexible space for community events, classes, meetings, and other recreational activities.
  • Lobby and Supporting Common Spaces: The facility will boast a welcoming lobby area along with supporting common spaces designed to foster community engagement and social interaction.
  • Walking Track: To promote physical activity and wellness, a dedicated walking track will be integrated into the facility, providing a safe and convenient space for individuals of all ages to exercise.

Sustainability Focus:

As advocates for environmental responsibility, we are committed to constructing the recreation center in accordance with LEED Silver standards. Our approach emphasizes energy efficiency, water conservation, and the use of eco-friendly materials to minimize the environmental impact of the facility.

Integration with PARC Arena:

One of the primary objectives of this project is to seamlessly integrate the new recreation center with the existing PARC Arena. Our team is dedicated to ensuring a harmonious transition between the two facilities, enhancing the overall recreational experience for residents and visitors alike.

Client: Town of Placentia

Location: Placentia, NL

Square Footage: 19,500

Year Completed: 2024

Architect: Fougere Menchenton Architecture

“ I found Olympic Construction to be a good partner to work with. They were always accessible during every stage of the project and were straight up with any challenges that came with construction; and very diligent in finding solutions. I am very satisfied with the services of Olympic Construction and would definitely work with them again. ”

John Steele
President, Steele Hotels

“ Working with Olympic means we get the best service, best construction but also we can rest easy knowing they are on the job. When taking on large projects it can be very expensive and stressful, however, the staff at Olympic Construction make you feel like family, and treat your project with the respect it deserves. When building, we only deal with Olympic for our business. ”

Dan Matthews
Dealer Principal, Volkswagen Audi

“ Olympic Construction was responsible for the build out of our latest location. They were incredibly knowledge, professional and timely in the execution of their work. They were able to adapt and respond to challenges very quickly and effectively. The team was a pleasure to deal with and the quality of their work was top notch. They handled every aspect of the project and kept us well apprised at all times. I look forward to working with them again in the future. ”

Niraj Shukla
Owner, Mustang Sally’s

“ Olympic turned our vision into a reality for a collaborative, modern headquarters with an in housegym. The team was extremely professional, organized, and timely. They made the experience a breeze for us with minimal involvement from our team. ”

John Williams
CEO, Nutra Holdings

Interested in joining the team?